There are already a few requirements for operating the balcony panels, At least here in Germany:
You need a suitable electricity meter
You have to register with a relevant authority and inform the electricity provider that you are operating a “balcony power plant”.
The microconverter should run on its own secured circuit. (“Should”, will certainly do very few)
But technically it is simple:
Set up panels
Connecting necessary plugs
Microconverter to the socket
Be happy that you produce up to 800 watts of your own electricity
I think it’s almost irrelevant how many panels you ultimately split up. However, no more than 800 watts may be fed in.But if you have panels with, let’s say, 2000 watts, you can of course charge various batteries with them beforehand. Nobody can say anything against it.
There are already a few requirements for operating the balcony panels, At least here in Germany:
I think it’s almost irrelevant how many panels you ultimately split up. However, no more than 800 watts may be fed in.But if you have panels with, let’s say, 2000 watts, you can of course charge various batteries with them beforehand. Nobody can say anything against it.